Levels | Storage Conditions | Floor Life | Handling | Drying |
---|---|---|---|---|
MSL 1 | ≤ 30°C/85% RH | Indefinite | No special controls needed | Pre-bagging: Optional Desiccant: Optional Label: If >235°C |
MSL 2 | ≤ 30°C/60% RH | 1 year | Requires dry pack | Pre-bagging: Optional Desiccant: Required Label: Required |
MSL 2a | ≤ 30°C/60% RH | 4 weeks | Requires dry pack | Pre-bagging: Required Desiccant: Required Label: Required |
MSL 3 | ≤ 30°C/60% RH | 168 hours | Requires dry pack | |
MSL 4 | ≤ 30°C/60% RH | 72 hours | Requires dry pack | |
MSL 5 | ≤ 30°C/60% RH | 48 hours | Requires dry pack | |
MSL 5a | ≤ 30°C/60% RH | 24 hours | Requires dry pack | |
MSL 6 | ≤ 30°C/60% RH | 72 hours, Must be baked | Requires dry pack and baking | Pre-bagging: Optional Desiccant: Optional Label: Required |
After each part is precisely placed, the real magic happens as boards pass through our reflow ovens. With POE’s advanced temperature profiling and nitrogen‑enhanced atmosphere, we eliminate oxidation and deliver solder joints that stand up to the toughest conditions.#PCBAssembly pic.twitter.com/6jS8zrQjI6
— POE PCB/PCBA Manufacturer (@poe_pcba) April 21, 2025
Since 1996, POE has become a globally renowned PCB company, providing small to medium volume PCB/ PCBA manufacturing services.