| Levels | Storage Conditions | Floor Life | Handling | Drying |
|---|---|---|---|---|
| MSL 1 | ≤ 30°C/85% RH | Indefinite | No special controls needed | Pre-bagging: Optional Desiccant: Optional Label: If >235°C |
| MSL 2 | ≤ 30°C/60% RH | 1 year | Requires dry pack | Pre-bagging: Optional Desiccant: Required Label: Required |
| MSL 2a | ≤ 30°C/60% RH | 4 weeks | Requires dry pack | Pre-bagging: Required Desiccant: Required Label: Required |
| MSL 3 | ≤ 30°C/60% RH | 168 hours | Requires dry pack | |
| MSL 4 | ≤ 30°C/60% RH | 72 hours | Requires dry pack | |
| MSL 5 | ≤ 30°C/60% RH | 48 hours | Requires dry pack | |
| MSL 5a | ≤ 30°C/60% RH | 24 hours | Requires dry pack | |
| MSL 6 | ≤ 30°C/60% RH | 72 hours, Must be baked | Requires dry pack and baking | Pre-bagging: Optional Desiccant: Optional Label: Required |
March build support at POE — for prototype & small trial runs.
— POE PCB/PCBA Manufacturer (@poe_pcba) March 16, 2026
If you’re about to kick off a new design, DM your Gerber + BOM (or just layer count + board size + qty). We’ll confirm what’s realistic on lead time and next steps.#PCBA #PCB #Prototype #TurnkeyPCBA #SMT pic.twitter.com/MIUN0m5wrH
Email: all@poe-pcba.com
Whatsapp: 85292069596
Tel: 0755-25312250/ +8613798543496
Factory Address: Floor 3, Jinyuan Industrial Park, No. 56, Tangtou Avenue, Shiyan Town, Baoan District, Shenzhen China
