High-Reliability Medical & Industrial-Grade Assembly. We fabricate the PCB, source components from authorized distributors, assemble, test, and ship finished boards to your door — one supplier, one quote, one delivery.
Industries served: medical, automotive, industrial control, IoT, consumer electronics, power supply.

Your design data is your competitive advantage. We protect it with signed agreements, restricted access and auditable process — not just promises.
A mutual, English-language NDA is signed before any Gerber or BOM is opened. Your project is contractually protected from day one.
Your design data is used only for your order. We do not share it with third parties, and we never relist or reuse your board for other customers.
Files sit on access-restricted servers with audit logs. On project close, we delete your data on written request — and confirm it in writing.
Every part is sourced from Digi-Key, Mouser, Arrow, Avnet or regional partners — full lot traceability, no gray market, no substitution without your written approval.
Trusted by engineering and procurement teams worldwide — from first prototype to 500K+ boards a month.
A full turnkey order covers six stages. You send design files once — we own every step until tested boards arrive at your dock.
Gerbers checked for manufacturability, BOM scrubbed for availability, lifecycle risk and cost. Findings reported before you commit to anything.
1–32 layers, HDI, rigid-flex, high-Tg and Rogers materials. Controlled impedance, ENIG, and 24-hour prototype service.
Authorized distributors only — Digi-Key, Mouser, Arrow, Avnet and regional partners. Full lot traceability, no gray market, no substitution without your written approval.
01005 to 0.3 mm BGA pitch at ±0.02 mm placement accuracy. 8-zone nitrogen reflow, mixed technology, press-fit and box build.
SPI, AOI, 3D X-ray on all BGA packages, ICT or flying probe, functional test. 100% inspection with a report for every lot.
Anti-static and moisture-barrier packing, full export documentation, and door-to-door shipping. One tracking number, one point of contact.
Already holding stock of critical parts? Partial turnkey and full consignment are both supported — supply what you have, we source the rest. Tell us what you need quoted →
Most first orders start full turnkey. If you already hold stock of critical parts, partial turnkey or full consignment may be cheaper — we'll tell you which.
Swipe sideways to compare
| Full Turnkey | Partial Turnkey | Consignment | |
|---|---|---|---|
| PCB Fabrication | ✓POE | ✓POE | You supply |
| Component Sourcing | ✓POE sources all | You supply some | You supply all |
| Assembly & Test | ✓POE | ✓POE | ✓POE |
| What You Send | Gerber + BOM | Gerber + BOM + some parts | Gerber + BOM + all parts |
| Suppliers You Manage | 1 | 2 | 2+ |
| Best For | Least admin, fastest | You hold critical stock | You control all sourcing |
Not sure which fits? Send your BOM and we'll model all three — including what it would cost you to source the parts yourself.
No automated pricing. No hidden line items. An engineer — not a pricing bot — reviews your files and quotes the job, usually within one business day.
Gerber (RS-274X), BOM, pick-and-place and assembly drawing. NDA signed before your files are opened.
Line-by-line BOM pricing with distributor part numbers, lead times and DFM findings. No bundled markup.
You confirm brands and any alternatives. We verify stock and lock pricing before procurement starts.
PCB fabrication and component procurement run at the same time. Assembly, first-article check, then 100% inspection.
Tested boards, CoC and traceability records, export docs ready. DHL, FedEx or sea freight — one tracking number, door to door.
Typical timelines from files received to boards delivered, for a complete turnkey order. Confirmed in writing at quote stage.
| Stage | Typical | What Affects It |
|---|---|---|
| Quote & DFM review | 24 hours | BOM completeness. Missing part numbers add one round trip. |
| Prototype (1–10 boards) | 5–7 days | Component stock. Long-lead parts are flagged before you approve. |
| Small batch (10–100) | 10–12 days | Stencil fabrication, procurement, first article inspection. |
| Volume production (100+) | 15–20 days | Component lead time dominates. Volume pricing locked at quote. |
Shipping time is separate and depends on destination and service. Freight terms and export documentation are confirmed in writing at quote stage.
Fabrication and assembly under one roof, so tolerances, materials and test coverage are agreed once and held across the whole build.
High-mix, low-to-high volume assembly for industrial, medical and communications hardware.
Bare board produced to your Gerbers, electrically tested before it reaches the assembly line.
Documentation is part of the deliverable — not an upsell. Every order ships with a certificate of conformance, and lot traceability records on request.
Click any badge to open the certificate. Declarations of conformity and material test reports are available on request.
Their DFM review caught two placement issues before we cut tooling. The quote came back in a day, boards in ten days, and the documentation was complete enough for our auditor.
Hardware Engineering Manager Industrial IoTWe moved three product lines to their turnkey service. One purchase order, one tracking number, no chasing component shortages. Customs and compliance paperwork has never held up a shipment — that alone pays for itself.
Procurement Manager Industrial EquipmentISO 13485 records and full lot traceability on every build. Technical questions go straight to an engineer, not through a sales layer. That is why we stayed.
Quality & Regulatory Lead MedTechA single prototype is the cheapest way to test us — same quote process, same documentation, same test report. If the first board is right, the volume order is the easy part.
Everything from bare board to tested assembly: DFM and BOM review, PCB fabrication, component sourcing from authorized distributors, SMT and through-hole assembly, inspection and testing, plus packaging and shipping. You provide Gerber files and a BOM — we handle the rest.
Within 24 hours on business days, for a complete file set. The quote is itemized by BOM line with distributor part numbers, so you can see component cost, fabrication, assembly and test separately — no bundled margin.
Gerber RS-274X, BOM in Excel or CSV, pick-and-place data, and an assembly drawing if you have one. Missing something? Send what exists and we will tell you what else is required before quoting.
No fixed MOQ. One prototype board is fine, and the same line scales to 500,000+ boards per month without re-qualification. Pricing per unit simply improves with volume.
Yes. Partial turnkey (you supply selected parts) and full consignment are both standard. Consigned components go through incoming inspection and climate-controlled storage, and are marked on the BOM.
We sign a mutual NDA before files are opened. Design data is stored on access-restricted servers, never shared with third parties, and deleted on request at the end of a project.
Every shipment includes commercial invoice, packing list, HS codes and certificate of origin. DAP is our standard term, so you clear the goods with your own EORI and handle import VAT through your normal process. DDP can be quoted on request for samples or low-value trial orders. DHL, FedEx and sea freight are all available.
They do not ship. Non-conforming boards are reworked and re-tested, or rebuilt at our cost when the fault is ours. You receive the failure reasons and the yield figures along with the replacement — not just a new box.
Typically 30% deposit with the balance before shipment for new accounts, net terms for established ones. Tooling and NRE are quoted separately as one-time items. Nothing is added after the quote is accepted.
You get a named, English-speaking engineer — not a shared inbox. Replies within 4 business hours, with overlap hours reserved for your local mornings. Any order running longer than two weeks gets a weekly status update with photos.
NDA signed before files are opened. Quote within 24 hours. No obligation, no follow-up spam.
POE Team — Engineering & Production